本站所有资源均为高质量资源,各种姿势下载。
The scheduling of the flow shop has been an ongoing challenge for many years. To address this issue, various methods have been proposed and one of them is the heuristic approach, which involves the use of a set of rules that are easily understandable and can be implemented in a short amount of time. One such method is the window input approach, which allows the user to input the key control parameters and observe the simulation graph and convergence curve. This method has been shown to be effective in improving the scheduling of the flow shop and can be used as a valuable tool in improving production efficiency.